Case Studies

Case Study: K12 Athletic Storage

Written by Sarah | Jun 11, 2026 3:50:43 PM

A PROFESSIONAL LOOK WITH TEAM SPIRIT

Transforming Athletic Storage into a Recruiting Asset

A private high school in Dedham, MA needed more than just better storage—it needed a statement piece. The goal was to convert a basic equipment area into a branded, efficient, and visually compelling space that could impress recruits and visitors alike.

Donnegan Systems designed and installed a customized storage system that not only expanded storage capacity by 50% but also integrated the school’s branding through custom-colored end panels. A new window display and built-in drawers added functionality while keeping the space polished and professional.

 

PROJECT HIGHLIGHTS

What Set This Project Apart

Branded Storage Panels
Custom-colored end panels were created to reflect the school’s identity and unify the space with its existing branding.

Interactive Window Display
A sleek, integrated window display with drawers and a countertop created a dedicated area for team interactions and visitor engagement.

Significant Capacity Boost
The new storage system increased available capacity by 50%, enabling smarter organization and improved access to equipment.

Clean, Secure Equipment Housing
Equipment is now stored cleanly, safely, and in an organized way—maintaining a professional look and preserving gear longevity.

PROJECT DETAILS

What We Delivered

A winning storage strategy—built for performance and pride. This storage upgrade prepares them on and off the field, so they are always game-day ready.

Custom-Branded Storage System
We crafted a tailored shelving solution with end panels and finishes that matched the school’s colors, turning a utility space into a cohesive part of the school’s athletic brand.

50% Increase in Storage Capacity
Through a more space-efficient layout and smart drawer integration, the new setup allowed the school to store more gear in less space while keeping everything easily accessible.

Recruitment-Ready Presentation

By combining functional design with visual appeal, we helped the school create a space that showcases its athletic program and impresses prospective students and families.

 

Enhanced Workflow Efficiency

Centralized, organized shelving allows staff to quickly locate and restock supplies, reducing downtime and improving overall surgical preparation.

Easy Maintenance

Mobile, watertight shelving units simplify cleaning and upkeep, helping staff maintain a sterile and efficient workspace with minimal effort.

PROJECT DETAILS

Read More About this Project

Ready to see how smart storage can support your school’s image and efficiency? Click below to download the full case study and explore the transformation.